Dotted Line on Progress Report
Some of your Progress Report graphs feature dotted lines in the background. What do they mean?
Written by Josh CaponLast update 4 months ago
On our graphs, dotted lines represent averages. For instance, if four students in your class finished the placement pretest at an 8th-grade level and four students finished at a 6th-grade level, the dotted line on the Pre-Test Grade Level Performance graph will run horizontally at y = 7, because the average performance in your class was at a 7th-grade level.
Did this answer your question?